Passing EMC Without Redesigning the Product

Overview
Recovering a late-stage compliance failure without restarting development or redesigning the core electronics.
Technologies
EMC | Compliance engineering | High-speed electronics | System integration
Define the Problem
A product failed radiated emissions testing late in development, placing project schedules and launch timelines at risk. A complete redesign would have introduced significant cost and delay.
Diagnose the Root Cause
Detailed investigation identified grounding loops and high-speed signal paths coupling into cables and enclosure structures, creating unintended radiating elements.
Key engineering challenges included:
Late-stage design constraints
Limited opportunity for PCB redesign
Multiple potential emission paths
Tight delivery timescales
Deliver the Solution
We implemented targeted improvements including shielding, filtering and grounding optimisation to address the highest-impact radiation mechanisms without redesigning the core architecture.
Key Outcomes
Achieved EMC compliance without full redesign
Avoided project delay and cost
Preserved existing product architecture
Improved overall EMC robustness

Comments